Quality You Can Verify —
Not Just Promised
18+ traceable QC checkpoints across titanium materials, precision machining, MMO / platinized anodes, and PEM electrolyzer assembly — supported by inspection records, test reports, and project-ready documentation.
QC Built for Industrial Approval
At Hele Titanium, quality control is built around traceability, inspection records, test data, and project-ready documentation — helping OEMs, EPC teams, system integrators, and industrial buyers verify product quality before approval, shipment, and installation.
Material Traceability
MTC, grade verification, batch records, and raw material documentation for titanium materials and components.
Dimensional Inspection
Drawing review, tolerance checks, machining records, weld inspection, and final dimensional inspection reports.
Coating Verification
XRF report, coating records, surface inspection, adhesion review, and MMO / platinized anode QC documents.
FAT & System Testing
PEM system test records, pressure checks, safety checks, hydrogen output verification, and FAT documentation.
Titanium Materials & Precision Machining QC
For titanium materials and machined components, quality control starts with material verification and continues through dimensional inspection, machining tolerance checks, surface condition review, welding inspection, packing control, and final documentation.
What this enables for your project
- EN 10204 3.1 MTC
- Dimensional Inspection Report
- PMI / UT/ET reports (if required)
- Packing list + export labeling photos (upon request)
Every CNC part is tied to a reviewable record, helping your team verify material integrity, dimensional accuracy, and shipment readiness with confidence.
01
Raw Material Verification
Titanium grade, heat number, supplier record, material form
MTC review, material traceability check
02
Chemical Composition
Ti content, alloying elements, impurity limits
Material certificate review / third-party testing if required
03
Dimensional Inspection
Thickness, diameter, length, hole position, machining tolerances
Drawing-based inspection
04
Machining Tolerance Review
CNC-machined dimensions, threads, slots, holes, interfaces
Caliper, micrometer, gauge, or CMM where applicable
05
Surface Condition Review
Scratches, dents, burrs, oxidation, surface finish
Visual inspection / surface requirement review
06
NDT / Pressure Test
Welds, tubes, pressure-related parts if required
Project-specific test method
07
Weld Inspection
Weld appearance, penetration, continuity, defects
Visual inspection / project-specific requirement
08
Final Inspection & Packing
Labeling, quantity, packing protection, shipment readiness
Final QC checklist
| QC Step | What We Check | Method / Standard | Buyer Can Request |
|---|---|---|---|
|
01
Raw Material Verification
|
Titanium grade, heat number, supplier record, material form | MTC review, material traceability check | MTC / Material Certificate |
|
02
Chemical Composition
|
Ti content, alloying elements, impurity limits | Material certificate review / third-party testing if required | Chemical Analysis / MTC |
|
03
Dimensional Inspection
|
Thickness, diameter, length, hole position, machining tolerances | Drawing-based inspection | Dimensional Inspection Report |
|
04
Machining Tolerance Review
|
CNC-machined dimensions, threads, slots, holes, interfaces | Caliper, micrometer, gauge, or CMM where applicable | Machining Inspection Record |
|
05
Surface Condition Review
|
Scratches, dents, burrs, oxidation, surface finish | Visual inspection / surface requirement review | Surface Inspection Photos |
|
06
NDT / Pressure Test
|
Welds, tubes, pressure-related parts if required | Project-specific test method | NDT Report / Pressure Test Record |
|
07
Weld Inspection
|
Weld appearance, penetration, continuity, defects | Visual inspection / project-specific requirement | Welding Inspection Record |
|
08
Final Inspection & Packing
|
Labeling, quantity, packing protection, shipment readiness | Final QC checklist | QC Report / Packing List |
What this means for buyers: full heat/lot traceability, measurable inspection checkpoints, and approval-ready documentation for every batch.
MMO & Platinized Anode Production QC
Validated coating integrity and electrochemical stability.
For MMO and platinized titanium anodes, quality control must verify not only dimensions, but also titanium substrate preparation, surface activation, coating consistency, coating loading, inspection records, and application suitability.
Shipment Documentation (Typical)
- • Coating Test Report (for anodes)
- • Dimensional / visual inspection checklist
- • Traceability record (Batch Record + process logs)
- • Third-party inspection support (SGS / BV / TUV) upon request
Each coating checkpoint is recorded through process-controlled logs and electrochemical validation, helping your team verify coating integrity before shipment.
| QC Step | What We Check | Method / Standard | Buyer Can Request |
|---|---|---|---|
|
01
Substrate Verification
|
Titanium grade, geometry, welding, substrate condition | Drawing review / material record review | Substrate Inspection Record |
|
02
Surface Prep Control
|
Cleaning, roughening, activation, surface readiness | Process record / visual inspection | Surface Prep Record |
|
03
Coating Formulation
|
Ru-Ir, Ir-Ta, IrO₂, Pt, or project-specific coating system | Application-based coating selection | Coating Spec Coating Report |
|
04
Application & Curing
|
Coating application sequence, thermal treatment, layer consistency | Production process control | Coating Process Record |
|
05
Thickness / Loading Check
|
Coating loading, distribution, active metal verification where applicable | XRF testing / project-specific method | XRF Report Coating Report |
|
06
Electrochemical Testing
|
Application-related electrochemical performance where applicable | Project-specific test conditions | Testing Report |
|
07
Final Inspection
|
Dimensions, coating appearance, connection, labeling, records | Final QC checklist | Final QC Report Traceability ID |
|
08
Packing & Protection
|
Anode surface protection, labeling, packing method, export readiness | Packing checklist | Packing Photos Packing List |
Coating Data Matters
For MMO and platinized titanium anodes, coating quality directly affects service life, current efficiency, and operating stability. Buyers should request coating-related documents such as XRF records, coating reports, and inspection photos when project approval requires traceability.
PEM Electrolyzer Assembly, Safety Check & FAT Testing
PEM electrolyzer systems require controlled assembly, utility integration, safety verification, and factory acceptance testing. Our QC process helps buyers verify system readiness before shipment and installation.
Buyer Note: For PEM electrolyzer systems, QC should not stop at visual inspection. Buyers should verify assembly records, leak and pressure checks, control response, safety interlocks, hydrogen output testing, and FAT documentation before shipment.
Shipment Documentation (Typical)
- FAT report + operation test data
- Assembly record + QC sign-off
- Traceability file (batch tracking + test logs)
- Export packing list + labels
From incoming component checks to full FAT validation, every critical assembly and performance checkpoint is tied to a reviewable engineering record.
| QC Step | What We Check | Method / Standard | Buyer Can Request |
|---|---|---|---|
|
01
Component Incoming Inspection
|
Stack-related components, BoP parts, sensors, valves, piping, power supply | Incoming QC checklist |
Incoming Inspection Record
|
|
02
Stack / Module Assembly Review
|
Assembly sequence, compression, sealing, interfaces, connection points | Assembly record / visual inspection |
Assembly Record
|
|
03
BoP Integration Check
|
Water treatment, cooling, gas-liquid separation, drying, control, safety modules | System integration checklist |
Integration Inspection Report
|
|
04
Leak & Pressure Test
|
Gas / water circuit sealing, pressure stability, pipe connections | Pressure / leak test procedure |
Leak Test Record
Pressure Test Report
|
|
05
Control System Check
|
PLC / HMI response, alarm logic, data display, operating parameters | Control logic test |
Control System Test Record
|
|
06
Safety Interlock Test
|
Emergency stop, gas leak alarm, overpressure alarm, automatic shutdown | Safety checklist |
Safety Test Report
|
|
07
Hydrogen Output Verification
|
Hydrogen output, purity, pressure, stability, system response | Factory test / project-specific conditions |
Hydrogen Output Test Report
|
|
08
FAT & Final Documentation
|
System readiness, test records, manuals, packing, shipment preparation | FAT checklist |
FAT Record
Operation Manual
Final QC Package
|
What this means for buyers: cleaner approval workflows, fully documented FAT results, and traceable system validation before delivery.
Final Audit Package for Project Approval
Before shipment or internal approval, industrial buyers often need a complete QC document package. Hele Titanium can prepare project-specific documentation based on product type, application, inspection requirements, and destination market.
Traceability Records
MTC, batch records, grade verification, material source documentation, and product traceability information.
Inspection Reports
Dimensional inspection, surface inspection, machining tolerance review, weld inspection, and final QC records.
Coating / Performance Records
XRF reports, coating reports, adhesion review, coating process records, and electrochemical test records where applicable.
Shipment & Compliance Documents
Packing list, certificate of conformity, datasheets, manuals, export documents, and project-specific documentation.
Get a QC Package Ready for Approval
Send your specification or drawing—our team will confirm the inspection plan and lead time within 24 hours.
Email: sales@heletitanium.com
Address: Titanium Valley, Baoji City, Shaanxi Province, China